Access the Full Project by Clicking here!
Bidjugde
JOB
Third Street Improvements Phase I – Underground Utilities
BID DATE
07/7/16 - 2:00
AGENCY
Davis
ESTIMATE
$900,000
SCOPE
The work shall include underground utility installations along Third Street as follows: mobilization; clearing, grubbing, earthwork, and demolition; traffic control system; construction surveying; potholing; curb drop inlets; storm drain and sanitary sewer maintenance holes; storm drain clean outs; storm drain laterals; connecting existing private drainage or downspout with surface overflow inlets; RCP; sanitary sewer main; sanitary sewer lateral; sleeve for sanitary sewer; water main vertical offset; sanitary sewer cleanout; curb and gutter and full depth AC; and concrete sidewalk replacement, including all labor, materials, equipment, and incidentals, to completely install an operating facility in accordance with the Project Plans and Specifications. All work shall be performed in accordance with the City of Davis Standard Specifications January 1996 Edition, Addenda through October 2009, California Department of Transportation Standard Specifications and Plans dated 2015, Davis-Bacon Wage Determinations, General Prevailing Wage Rate, Labor Surcharge and Equipment Rental Rates, and the Contact Documents.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT