Martin Luther King Jr. Way Streetscape Improvements
BID DATE
07/28/16 - 2:00
AGENCY
Oakland
ESTIMATE
$2,090,348
SCOPE
BID DATE CHANGED. The proposed work consists, in general, of streetscape improvements on Martin Luther King Jr. Way from 32nd St to 35th St. It includes construction of bulbouts, sidewalk, curb and gutter and ADA ramps; installation of pedestrian lights, bike racks, benches; modification of traffic signals at 34th St intersection, landscaping including tree planting, grinding and overlay, new storm drain, drainage connectors and drainage inlets, bus stop relocation and striping. The project also includes restriping Martin Luther King Jr. Way from West Grand Ave to 40th St to change lane configuration from 4 through lanes to 2 through lanes with a turning lane, and adding Class II bicycle lanes on both sides of the street, and other work specifically shown in the project documents. A mandatory pre-project meeting is scheduled for Jul 5, 2016 - 10:00 am
PREBID
7/5/2016 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT