Riverside Corridor 10th to 12th and 14th
BID DATE
07/21/16 - 2:00
AGENCY
Paso Robles
ESTIMATE
$345,000
SCOPE
Furnishing all labor, materials, equipment, and performing all work necessary and incidental to the construction of the project known as Riverside Corridor Project – 10th to 12th and at 14th, DPW Project No. 15-04, according to drawings and specifications prepared by the City of El Paso de Robles and according to the Contract Documents. The work shall include but is not limited to, installation of irrigation and landscaping, remove and replace existing paving, upgrade curb ramps, and install pervious pavers, all as shown on the plans and/or as specified herein.