Access the Full Project by Clicking here!
Bidjugde
JOB
Alder Drive at EID Canal Bridge Replacement
BID DATE
07/7/16 - 2:00
AGENCY
El Dorado County
ESTIMATE
$575,000
SCOPE
Replacement of the existing concrete bridge with two (2) thirty (30) inch diameter culverts over the EID canal; concrete headwalls, guardrail construction, grading, paving, signing, striping and miscellaneous concrete construction. Other items or details not mentioned above, that are required by the plans, Standard Plans, Standard Specifications, or these Special Provisions must be performed, constructed or installed. For questions related to bidding for any West Slope projects, please contact Jennifer Rimoldi at (530) 621-7592 or jennifer.rimoldi@edcgov.us or Brian Franklin at (530) 621-5311 or brian.franklin@edcgov.us

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT