F Street Storm Line
BID DATE
06/14/16 - 2:00
AGENCY
Los Banos
ESTIMATE
n/a
SCOPE
The major work consists of installing 1,086 feet of 12-inch and 18-inch storm drain pipeline including manholes and catch basins, and construction 418 square feet of sidewalks and accessible ramps including curb & gutter, along F Street from Third Street to Fifth Street.