Access the Full Project by Clicking here!
Bidjugde
JOB
Storm Drain 2016
BID DATE
07/7/16 - 3:00
AGENCY
Redding
ESTIMATE
n/a
SCOPE
Replacing rusted and deteriorated corrugated steel storm drain pipe that includes reconstructing eroded road embankment(s) at two locations in different parts of the City as follows: • Keswick Dam Road at Sulphur Creek crossing ( ½ mile west of Lake Blvd) – Existing 36 CMP with 60 HDPE • West Street at Rosaline Ave – Existing 48 CMP with 36 HDPE

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT