Access the Full Project by Clicking here!
Bidjugde
JOB
Town Center Sewer Pump Station Improvements (REBID)
BID DATE
12/1/16 - 2:30
AGENCY
Woodside
ESTIMATE
$791,000
SCOPE
ORG BID RESULTS Casey Construction - $956,150 Work includes all labor, materials, tool and equipment necessary for furnishing and installing approximately 28 LF of 6 PVC SDR26, 66 LF of 8 PVC SDR26, 24 LF of 12 PVC SDR26 gravity sanitary sewer, and 80 LF of 4 DIP sanitary sewer force main; a 26-foot deep, 72 (6) diameter precast wastewater wet well with two ( 2 ) - Flygt submersible pumps; a new System Control and Data Acquisition (SCADA) equipment with smart manhole lid; a new el ec tric a l control cabinet and a new 50kW diesel generator with sound enclosure subbase fuel tank; a 11-foot deep, 48 diameter inside sanitary sewer drop manhole with pour-in-place base, and CIM1000 lined; a timber lagging retaining wall; a new 1 water service line; a new asphalt concrete pavement; rehabilitating existing wetwell; and abandoning sanitary sewer mains and manholes, complete in place, including but not limited to excavation of trenches, laying pipe materials and installation of structures, backfill trenches, pavement removal and new surfacing and other pertinent work as necessary to construct the project as shown on the approved plans and specified in the project specifications .

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT