Access the Full Project by Clicking here!
Bidjugde
JOB
24th Street Reconstruction - Avenue B to Avenue C
BID DATE
06/28/16 - 2:00
AGENCY
Yuma
ESTIMATE
$2,575,000
SCOPE
The work includes removing existing AC pavement and placing 4 AC pavement over 12 ABC; installing new sidewalk, curb & gutter at various locations; Placing sidewalk ramps and reconstruct driveways at various locations; Grading earthen storm water storage channels; Constructing new Multi-use paths on both sides of the roadway; Installing LED street light pole assembly; Place interim and final pavement markings; Adjust valves and manholes to grade; Place survey monuments; Project traffic control; Storm water pollution prevention measures and miscellaneous construction.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT