Access the Full Project by Clicking here!
Bidjugde
JOB
El Camino Real Water Main Improvements
BID DATE
05/12/16 - 2:00
AGENCY
Burlingame
ESTIMATE
$1,300,000
SCOPE
The work consists of installing approximately 2,900 linear feet of new 4-inch, 6-inch, 8-inch and 10-inch Ductile Iron (DI) water main on El Camino Real, between Broadway and Hillside Drive; El Camino Real at Ray Drive/Rosedale Avenue; and El Camino Real at Murchison Drive in the City of Burlingame, together with all service connections, valves, fittings, fire hydrants, and appurtenances and other work required to make a complete and operable system. The existing water mains will be abandoned in place. The construction method is anticipated to be conventional open trench. The Engineer’s Estimate for this work is $1,300,000.
PREBID
4/27/2016 5:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT