Sewer Repair and Rehabilitation Mid City Area Group B
BID DATE
04/28/16 - 10:00
AGENCY
West Hollywood
ESTIMATE
$435,000
SCOPE
The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals for sanitary sewer repair and rehabilitation for a total of twenty-seven (27) sanitary sewer pipeline segments throughout the City of West Hollywood at various locations as required by the Plans, Specifications, and contract documents. A few segments will require a point repair, and/or have the existing liner to be replaced. The rest of the segments will be lined with CIPP. All segments include reconnection and resealing of existing laterals to the rehabilitated sewer lines; sewer cleaning, pre-construction and post-construction CCTV inspection; implementation of an Emergency Sewage Spill Response Plan, Water Pollution Control Plan, Best Management Practices; and all appurtenant work as shown on the plans and delineated in these specifications. Donn Uyeno/ 323-848-6457 duyeno@weho.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT