Access the Full Project by Clicking here!
Bidjugde
JOB
Regnart Creek Erosion Repair
BID DATE
06/1/16 - 2:00
AGENCY
Santa Clara Valley WD
ESTIMATE
$700,000
SCOPE
1. Compliance with NPDES General Permit, including Storm Water Pollution Prevention Plan preparation, installation of BMPs; 2. Clearing and grubbing within the project limits, including the removal of vegetation, sack concrete, and other miscellaneous items; 3. Channel excavation, including testing and disposal of unsuitable materials; 4. 5. In-channel grade control structures to stabilize the channel invert; Embankment reconstruction (earth repair with burried rocks along footing) and replacement of unsuitable material, as required, in order to reestablish the channel design geometry; 6. 7. Temporary shoring as needed for the channel bank construction; Preparation of an Excavation Safety Plan; Page 2 of 5 8. Removal of non-native, invasive plants/trees within the project footprint; 9. 10. 11. 12. 13. 14. Planting of native species as required; Control of water; including proper diversion of upstream drainage and channel flows; proper handling and disposal of groundwater flows that are byproducts of the required construction; proper handling and diversion of storm drain runoff from outfalls; Traffic control; Establishment of temporary construction staging areas; Winterization of all disturbed areas including embankments; Other miscellaneous construction work and items necessary to satisfactorily complete the work. scvwdplanroom@valleywater.org.
PREBID
5/11/2016 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT