Access the Full Project by Clicking here!
Bidjugde
JOB
Lower Silver Creek Flood Protection Creek Protection
BID DATE
06/8/16 - 2:00
AGENCY
Santa Clara Valley WD
ESTIMATE
$2,500,000
SCOPE
The Project scope relates to channel improvements on the Lower Silver Creek (LSC) Reach 4, at the existing Dobern Pedestrian Bridge crossing. Construction of channel improvements includes the construction of approximately 300 feet of floodwall along both banks, slope protection, a new maintenance road, and a retaining wall for a future trail by others. A major component of the Project involves the removal of the existing pedestrian bridge, heightening of the existing bridge abutments, and then replacement of the same bridge. Raising of the pedestrian bridge will warrant new ADA compatible access ramps at each end of the bridge. Also included is the removal and replacement of associated landscaping and irrigation at the bridge approaches. scvwdplanroom@valleywater.org.
PREBID
5/26/2016 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT