Jackson Street 24 inch Recycled Water Pipeline Phase I (REBID)
BID DATE
04/26/17 - 2:00
AGENCY
Riverside
ESTIMATE
$8,500,000
SCOPE
ORG BID RESULTS: Borden Excavating - $4,791,430 EJ Meyer - $5,252,222 CP Construction - $5,481,550 Downing Construction - $5,683,300 WEKA Inc - $5,837,499 MNR Construction - $6,037,650 Gwinco Construction & Engineering - $6,138,500 Apple Valley Construction (AVCCI) - $6,316,470 Blois Construction - $6,370,173 Colich & Sons - $6,631,850 TBU Inc. - $7,046,850 Vido Artukovich & Son Inc - $7,340,002 The work to be done, in general, shall include furnishing all labor, materials, tools, equipment, and incidentals, unless otherwise specified, to construct the water pipeline complete in place in accordance with the Plans and Specifications. The project involves the construction of a recycled water pipeline and appurtenances consisting of approximately 15,400 linear feet of 24-inch Mortar Lined and Coated Steel Pipe; 2,100 linear feet of 8-inch Ductile Iron Pipe; 350 linear feet of 36-inch steel casing pipe; Bore and Jack 100 linear feet of 16-inch steel casing pipe; 2,110 gallon surge tank; Fill 8,300 linear feet of 48-inch and 42-inch techite pipe with controlled low strength material

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT