Access the Full Project by Clicking here!
Bidjugde
JOB
Alley Rehabilitation and Dust Control
BID DATE
06/16/16 - 4:00 LIVE!
AGENCY
Chandler
ESTIMATE
n/a
SCOPE
UPDATED ADOT DBE LINK. Alley or alley right-of-ways shall be cut to grade using a rotary asphalt-milling machine equipped with a conveyor belt which can load milled material directly into dump trucks. The CONTRACTOR shall over-excavate approximately 6 inch below the current surface grade at an average width of 14 feet or as directed by a Contract Administrator/designee.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT