Access the Full Project by Clicking here!
Bidjugde
JOB
Retrofit group 8 Backwater Sewer Relief Valve
BID DATE
02/14/12 - 3:00
AGENCY
Lake Havasu City
ESTIMATE
n/a
SCOPE
Lower existing sewer cleanout riser necessary to install new sewer relief valve a minimum of four inches below the finish floor elevation, excavate existing lateral for the purpose of installing a new backwater valve, or install a new cleanout and sewer relief valve. Perform minor lot grading as necessary to provide positive drainage away from the structure.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT