Cabresto Dam and Reservoir Liner
BID DATE
08/7/17 - 1:00
AGENCY
General Services Department
ESTIMATE
$425,000
SCOPE
The Project will mitigate seepage through the right abutment at Cabresto Dam. Once seepage has been mitigated, the dam will return to full function and allow for the removal of storage restrictions currently placed on the dam by the OSE because of dam safety concerns. The Project consists of the following major work items: • Riprap Salvage: removal, stockpile, and replacement of existing riprap on the dam and reservoir slope • Excavation: excavation and regrading of a portion of the reservoir slope, and subgrade preparation • Geosynthetic Liner Installation: installation of geosynthetic liner over prepared subgrade • Fill: backfill over the geosynthetic liner to restore the reservoir slope Marcos.Mendiola@state.nm.us