Access the Full Project by Clicking here!
Bidjugde
JOB
LBRID Water Tank Replacement
BID DATE
05/5/16 - 3:30
AGENCY
Napa County
ESTIMATE
n/a
SCOPE
The Lake Berryessa Resort Improvement District project includes the following: the furnishing and installation of one (1) new 180,000 gallon bolted steel water storage tank, one (1) new 110,000 gallon bolted steel water storage tank and one (1) new 85,000 gallon bolted steel water storage tanks, along with all associated appurtenances, demolition of existing tanks, cathodic protection, foundation design, and construction, earthwork, grading, soil stabilization, and drainage of the tank sites; pump station improvements at two pump station sites, including new pumps, appurtenances, piping, and valving, electrical, and SCADA systems; access road improvements to Tank Site 3; and overall SCADA improvements. Engineers estimate is $1,359,703. Contractor shall possess a Class A license. Two pre-bid site visits are scheduled, attending and signing in for one of the two site visits is mandatory Annamaria.Martinez@countyofnapa.org
PREBID
4/6/2016 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT