Access the Full Project by Clicking here!
Bidjugde
JOB
Well 24 & Well 26 Water Main
BID DATE
06/14/16 - 2:00
AGENCY
Woodland
ESTIMATE
$840,000
SCOPE
Wells #24 and #26 are nearest to the transmission main and are best suited to blend native groundwater with surface water prior to entering the distribution system. Well #16 will be connected directly to the transmission main as part of construction of the West Transmission Main project. The project entails extending water main to directly connect both wells to the transmission main without any connection to the distribution system. The total length of the project is approximately 4,000 feet. Piping reconfiguration will be necessary at both well sites along with landscaping work to restore disturbed surfaces.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT