Access the Full Project by Clicking here!
Bidjugde
JOB
Citywide ADA Ramps and Street Reconstruction Phase 2
BID DATE
06/7/16 - 2:00
AGENCY
Monterey
ESTIMATE
$2,400,000
SCOPE
In general, the work consists of, but is not limited to, the demolition and construction of concrete curb, gutter, cross gutter, sidewalk and curb ramps, storm drainage, striping and signage and isolated street surface repairs. The work also consists of the grinding, removal and legal disposal of existing roadway materials, demolition of asphalt concrete pipe (ACP) storm drain and installation of vehicular Hot Mix Asphalt (HMA) pavement. Thomas Korman City of Monterey Public Works/Engineering 353 Camino El Estero Monterey, CA 93940 Tel:(831) 646-3997 Fax:(831) 646-5686 korman@monterey.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT