Access the Full Project by Clicking here!
Bidjugde
JOB
2016 Full Depth Reclamation
BID DATE
05/17/16 - 2:00
AGENCY
Moraga
ESTIMATE
$1,634,000
SCOPE
The Scope of Work includes but is not limited to: mobilization; traffic control and construction signage; water pollution control, including preparation of a Storm Water Pollution Prevention Plan (SWPPP); clearing and grubbing including pruning and tree removal; traffic striping, traffic markings, and markers removal; removal and replacement of concrete curb, gutter and sidewalk, and construction of concrete valley gutter and curb ramps; removal and replacement of chain link fencing; metal beam guard rail installation; overexcavation if required, conform grinding, removal of asphalt concrete (AC) and aggregate base (AB), full-depth reclamation (FDR), and placement of AB, hot mix asphalt (HMA) and rubberized hot mix asphalt (RHMA) overlay; adjusting of utility features (e.g. water valve boxes, sanitary and storm drain manhole frame and covers); storm drain outfall and roadway embankment stabilization involving construction of a soldier pile and wood lagging retaining wall, storm drain pipe replacement, and installation of rock slope protection; storm drain repair and replacement consisting of reinforced concrete pipe (RCP) point repairs and cured-in-place pipe (CIPP) rehabilitation, and replacing corrugated metal pipe (CMP) with high density polyethylene (HDPE) pipe; placement of thermoplastic traffic stripes, pavement markers, and thermoplastic pavement marking publicworks@moraga.ca.us
PREBID
4/18/2016 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT