Access the Full Project by Clicking here!
Bidjugde
JOB
WRP Rehabilitation and Process Improvements Phase 1
BID DATE
05/10/16 - 2:30
AGENCY
Livermore
ESTIMATE
$2,000,000
SCOPE
The Work comprises the construction of the following major elements at the Livermore Water Reclamation Plant, including, but not limited to the following: • Replacement of the grit collection system including two grit classifiers, grit bin, and CMU grit bin enclosure. • Replacement of the in-line polymer mixer at the feed line to the tertiary filters. • Replacement of the four sodium hypochlorite storage tanks with new double walled FRP tanks. • Replacement of the existing recycled water pump station including five 150 hp vertical turbine pumps, surge tank, piping, remote I/O panel, and appurtenances. The five new vertical turbine pumps will be pre-purchased by the City. The Contractor shall be responsible for accepting delive1y, installation, and testing of the units. The Contractor shall also be responsible for providing, maintaining, and operating a temporary bypass system at the Doolan Reservoir site that transfers potable water to the recycle water reservoirs during the shutdown for construction. • Site work, concrete improvements, mechanical improvements, electrical improvements, instrumentation improvements, and other miscellaneous improvements for each major element as necessaty to render this project complete and operational.
PREBID
4/19/2016 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT