Access the Full Project by Clicking here!
Bidjugde
JOB
Desert Vista High Practice Field Renovation
BID DATE
05/6/16 - 3:00
AGENCY
Tempe Union High School
ESTIMATE
$400,000
SCOPE
The scope of work for this project consists of the removal of the existing turf and 6” of existing soil in the practice fields at the southwest corner of the site. Clean topsoil shall be imported and installed. Approximately 177,400 sf of new sod shall be installed. For the westerly 93’ of the practice field the top 3” of turf shall be removed and 3” of stabilized infield mix will be installed in the shot-put practice area (approximately 40,950 sf). A new 6” curb will be installed between the turf and the infield mix. The existing concrete shot-put throw pads will be removed and replaced (approximately 1,570 sf). All existing sprinkler heads in the practice field shall be removed and salvaged. All new heads will be installed. Mainline, valves and lateral lines will remain and be protected except as noted on the irrigation plans. Lead Entity: TUHSD213 - Tempe Union High School District No. 213 Opening Location: 500 W. Guadalupe Road, Tempe, AZ 85283 Contact Person: Trish Lorenzen Phone: 480-345-3714 Email: plorenzen@tempeunion.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT