Hamilton Storm Drain Repair Hangar Avenue
BID DATE
05/9/16 - 2:00
AGENCY
Novato
ESTIMATE
$75,000
SCOPE
The work to be done includes, but is not limited to: removing approximately 65 feet of existing damaged storm drain pipe (42-inch HDPE) and replacing it with new corrugated-smooth interior HDPE pipe to the same invert elevations as the existing pipe. The new pipe shall connect between an existing grated drop inlet behind back of sidewalk at Hangar Avenue near the intersection with Stern Drive and the existing eccentric manhole along the existing 84-inch RCP main storm drain line. The work includes temporary protection fencing, excavation, shoring, backfill using excavated material, and final grading to the approximate original contours. The City will provide final surface restoration (grass seeding). Tony Williams City of Novato 922 Machin Avenue Novato, CA 94945 Tel:(415) 899-8929 Fax:(415) 899-8251 awilliams@novato.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT