Boardman Drive & Ridgecrest Avenue Water Line Extensions
BID DATE
04/28/16 - 2:00
AGENCY
Gallup
ESTIMATE
$300,000
SCOPE
This portion of the project consists of installing approximately 2,125 linear feet of 10 inch C900-07 DR18 waterline as shown on the contract drawings. Waterline will be installed under existing wash, through landscaping including trees and across Boardman Drive. Work will include two (2) tie-in connections to existing 8-inch waterline material specified in contract drawings. Work will include installation of 20-inch schedule 40 steel casing and PVC carrier pipe (L=81’) with restraints across Boardman Drive (Hwy NM 564). Work will include installation of three (3) fire hydrant assemblies and a number of gate valves and fittings. Work site is along and across Boardman Drive (Hwy NM 564). Traffic control will be required. Work will include trenching, backfilling, compaction and compaction testing. Sidewalk, curb/gutter and asphalt removal and replacement will be required. Advertisement and notification of water shut-off of all affected customers 48 hours prior to shut-off is included in this portion of work. This portion of the project is located in Gallup, New Mexico adjacent and across Boardman Drive (Hwy NM 564). Frances Rodriguez (505) 863-1334 frodriguez@gallupnm.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT