Access the Full Project by Clicking here!
Bidjugde
JOB
Hummingbird Way & Sunrise Blvd Culvert Replacement
BID DATE
04/21/16 - 2:00
AGENCY
Prescott
ESTIMATE
$300,000
SCOPE
The above named Project scope of work shall generally consist of the removal of three existing 60- inch diameter corrugated metal pipes at both the Hummingbird Way and Sunrise Boulevard Road Crossings, and installation of 24-foot by 6-foot concrete arch structures, including roadway and water main removals and replacements at both crossings.
PREBID
4/11/2016 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT