Navajo Gallup Water Supply Project Reach 27.6
BID DATE
05/3/16 - 2:00
AGENCY
Gallup
ESTIMATE
$10,000,000
SCOPE
Project consists of the following main items: 18 TRANSMISSION LINES 6A & 6B, Northerly of and adjacent to the City of Gallup and I-40: 1. 28,000 (approximately) of 18 Ductile Iron Pipeline. 2. Highway 608 Bore & Crossing (219 of 28 Casing & 18 Carrier). 3. 495 of 18 Cl 250 GRP Restrained Pipe and Fittings 4. Pump Station with 2-125HP Pumps, 3 Pressure Reducing Valves, 2 Pump Control Valves, Surge Tanks, and Misc. Appurtenances. 12 TRANSMISSION LINE 6B, Northeasterly of and within the City of Gallup: 1. 2686 of 12 Ductile Iron and PVC Pipeline. 2. I-40 Highway & x-rd Bore and Crossings (431 of 24 Casing & 12 Carrier) and (100 of 24 Casing & 12 Carrier) 3. Highway 118 & BNSF RR Bore and Crossing (450 of 24 Casing & 12 Carrier) 4. Pressure Reducing Station. 8 & 14 CONNECTOR LINES, Within and Near To City of Gallup: 1. 400 of 8 SDR 35 PVC Sewer Line (Northeast Area). 2. 900 of 14 Ductile Iron Pipeline 3. 400 of 8 C900-07 PVC Pipeline 4. I-40 Highway Bore and Crossing (311 of 24 Casing & 14 Carrier). 12 MONTOYA WATER LINE, Within the City of Gallup (Adjacent to Montoya Blvd.): 1. 1800 of 12 C900-07 PVC Pipeline. ABANDONED MINE REMEDIATION, Along Portions of Pipeline 6A Above: 1. Drill Holes, Video Camera Exploration, Grout Placement and Excavation/Backfill. The project also includes installation of gate valves, construction of air release stations, manholes, trenching, backfilling, traffic control, and the removal and replacement of pavement and permitting. Frances Rodriguez (505) 863-1334 frodriguez@gallupnm.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT