Access the Full Project by Clicking here!
Bidjugde
JOB
Via Tortuga Low Water Crossing
BID DATE
04/5/16 - 10:00
AGENCY
Wickenburg
ESTIMATE
$250,000
SCOPE
The low-water crossing will replace a concrete structure that was damaged and has been removed from last summer’s monsoon season. The project will consist of grading the roadway to a desired profile, constructing a concrete crossing through the river bottom, building river bank protection and repaving the roadway. Project will have a 60-day construction timeline. All questions pertaining to the project need to be emailed to vlorefice@wickenburgaz.org on or before March 28, 2016.
PREBID
3/24/2016 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT