Paseo Vista Recreation Area Drainage
BID DATE
02/1/12 - 2:30 LIVE!
AGENCY
City of Chandler
ESTIMATE
n/a
SCOPE
Work under this contract includes construction on new rip rap drainage channels including installation of filter fabric, clean-out and repair of existing rip-rap drainage channels, installation of HDPE storm drain/catch basin , earthen erosion repairs/fill rivulets, grouting under existing headwalls, construct berms, re-grading access road and other areas of landfill, install liner gabion basket repair/construction, construct, replace/recompact stabilized DG, and sediment/misc. site removals; and may include the installation of a storm drain pressure pipe and pump with vault and electrical controls, drywell, and concrete catch basin.