Access the Full Project by Clicking here!
Bidjugde
JOB
Site Development Well 4 & Well 9
BID DATE
04/26/16 - 2:00
AGENCY
Ukiah
ESTIMATE
$2,311,000
SCOPE
The work includes, but is not limited to, furnishing all labor, equipment, materials, and supplies to provide site improvements for two newly- constructed municipal potable water wells. Work includes clearing and grubbing; excavation; grading; saw-cutting existing hot mix asphalt pavement; demolition of existing buildings; installing well pumps with associated electrical and instrumentation work; installing a new water main, including fittings, flow meters, check valves, gate valves, and associated piping and appurtenances; constructing two chlorination and control buildings with HVAC, plumbing, mechanical and electrical work; providing pre-fabricated wellhead enclosures; installing a chlorination system; installing sanitary drains and connecting to the existing sewers; backfill and compaction; installation of fences and gate; surface restoration, including hot mix asphalt paving; and all other work described in the plans and specifications in accordance with the Contract Documents. Mary Horger City of Ukiah 411 West Clay Street Ukiah, CA 95482 Tel:(707) 463-6233 Fax:(707) 463-6234 mhorger@cityofukiah.com
PREBID
3/30/2016 1:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT