Access the Full Project by Clicking here!
Bidjugde
JOB
FY 2015 16 ADA Curb Ramps
BID DATE
04/14/16 - 10:00
AGENCY
Sutter County
ESTIMATE
$100,000
SCOPE
The work to be performed under this contract includes the furnishing of all labor, materials, equipment, transportation and services necessary for the FY2015-16 ADA CURB RAMPS PROJECT. The work will include retrofitting nine (9) corners with pedestrian access curb ramps at location nos. 1, 3, 4, 5 and 6, and replacing a portion of sidewalk at location no. 2. Location nos.1 thru 5 are located in the southern portion of Yuba City, east of State Route 99 and location no. 6 is located at Sutter Union High School in the Town of Sutter as shown in Project Location Maps 1 & 2. Existing concrete curbs, gutters, sidewalks and access ramps will be removed and replaced to bring facilities up to current ADA standards. Other related work associated with this project is the removal and replacement of asphalt along the perimeter of the ADA improvements. One (1) intersection has barrier curbs, three (3) intersections have rolled curbs, one (1) location will have a portion of sidewalk removed and replaced and one (1) location will have an ADA curb ramp installed.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT