Access the Full Project by Clicking here!
Bidjugde
JOB
Hermosa Drive Street & Storm Drainage Improvements
BID DATE
03/24/16 - 3:00
AGENCY
Palm Springs
ESTIMATE
$1,100,000
SCOPE
The Work comprises the widening and extension of Hermosa Drive generally located between Tahquitz Canyon Way and Baristo Road, including: grading and earthwork; construction of RCP storm drain pipe (18 to 42 diameter), RCB storm drain culvert (42x72 and 27x96), catch basins and related structures; construction of concrete curbs, gutters, sidewalk, and curb ramps; cold milling existing and construction of new asphalt concrete pavement; traffic striping, signage and markings; and all other appurtenant work.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT