JOB
Lift Station 1 Improvements
BID DATE
12/15/26 - 3:00
AGENCY
Cross Valley Water District
ESTIMATE
$1,000,000
SCOPE
Cross Valley Water District, Lift Station 1 (LS-1) Improvements Project, at the existing wastewater lift station at 21931 Bostian Road, Woodinville (Maltby), Washington. Work includes replacement of the diesel generator, owner-furnished ATS, wet well level transducer and float switches, main circuit breaker and generator disconnect, interior and exterior LED lighting, mini power center, and power meter and service disconnect; structural coating, ring-joint, handrail and access work in the dry well; a new concrete slab and canopy for the standby generator; recoating of metallic piping; replacement of pumps, gate valves and check valves; and temporary sanitary sewage bypass. Estimated construction cost $1,000,000, excluding Washington State sales tax. The entire contract is to be completed within 100 calendar days. Bids are due December 15, 2026 at 10:00 a.m. at 8802 180th Street SE, Snohomish. A prebid tour departs from the District office on December 8, 2026 at 10:00 a.m.; prospective bidders are encouraged to participate (not mandatory). Contact Cameron Ochiltree, PE, BHC Consultants, cameron.ochiltree@bhcconsultants.com , 206-505-3400. https://bxwa.com/bxwa_toc/pub/3033/e1931_lift_station_1_improveme_91396/info.php
PREBID
12/8/2026 3:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT