Access the Full Project by Clicking here!
Bidjugde
JOB
Lift Stations 16 17 18 Upgrades S2004A
BID DATE
01/7/27 - 8:00
AGENCY
Alderwood Water and Wastewater District
ESTIMATE
n/a
SCOPE
Alderwood Water & Wastewater District Contract S2004A, Lift Stations 16, 17 & 18 Upgrades. Work includes construction of a duplex submersible sewer Lift Station 16 with a new wet well, valve/meter vault, piping, pumps, motors, electrical, instrumentation and communication, and removal of remaining structures; construction of a triplex sewer Lift Station 17 on a new site including a building, piping, pumps, motors, underground offline storage, 10-inch HDPE force main, 12-inch gravity sewer and manholes, and AC pavement restoration; construction of a duplex submersible sewer Lift Station 18 with similar wet well, vault, piping, pumps and offline storage work; abandonment, demolition and modifications to existing sewer Lift Station 11A; and installation of three vacuum relief valves on the existing Lift Station 5 sewer force main. Cost estimate range $10,900,000 to $14,600,000. Contract duration was not stated in the Advertisement for Bids or the early specification pages reviewed; duration is entered as the 120 default. Bids are due January 7, 2027 at 3:00 p.m. at the District Administration Building, 3626 156th Street SW, Lynnwood. A pre-bid meeting will be held there on December 18, 2026 at 10:00 a.m.; attendance is strongly encouraged but not mandatory. Contact James Waihenya, jwaihenya@awwd.com. https://bxwa.com/bxwa_toc/pub/46/aw42_lift_stations_16_17_amp_1_88105/info.php
PREBID
12/18/2026 3:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT