Pump Station Improvements (REBID)
BID DATE
04/7/16 - 3:00
AGENCY
Oakland
ESTIMATE
$2,016,020
SCOPE
ORG BID RESULTS: Bay Construction Co. - $2,094,672 Valentine Corp. - $2,142,440 McGuire & Hester - $2,263,450 D Line Constructors - $2,663,000 The proposed work consists, in general, of removing and replacing equipment, demolishing existing equipment and structures, rehabilitating existing structures, and installing new equipment at three (3) sewage lift stations. Equipment to be replaced and installed include various pumps, piping, valves, electrical equipment, and adding three (3) standby engine generators, and other items shown to be constructed on the contract drawings or specifications, including repair, and reconstruction of existing improvements affected by the Work, and incidentals for complete and usable facility, and other work specifically shown in the project documents.