Access the Full Project by Clicking here!
Bidjugde
JOB
West Side Loop Section 3 36-Inch Water Main Replacement
BID DATE
12/22/26 - 3:00
AGENCY
Cobb County-Marietta Water Authority
ESTIMATE
n/a
SCOPE
Cobb County-Marietta Water Authority West Side Loop Section 3 36-inch Water Main Replacement in southwest Cobb County, Georgia. Replace existing 36-inch prestressed concrete cylinder pipe and some 36-inch ductile iron pipe with about 37,000 LF of 36-inch zinc-coated, double bonded-joint and double poly-wrapped DIP. The alignment begins at Casteel Road and Friendship Church Road, continues south on Villa Rica Road, intersects SR 360/Macland Road, continues on Old Villa Rica Road, then turns east on Macedonia Road to a tie-in just before Barrett Parkway. Substantial completion is 1,430 consecutive calendar days; final completion is 1,460 consecutive calendar days from commencement. Sealed bids due 10:00 a.m. local prevailing time, Tuesday, December 22, 2026, at 1170 Atlanta Industrial Drive, Marietta, Georgia 30066. Mandatory pre-bid conference December 8, 2026, at 10:00 a.m. at the same address. Only contractors pre-qualified with CCMWA to construct 36-inch and larger water mains at the time of first publication may receive plans and bid. Solicitation PE-66365-NONST-2028-000000039. Project location: Casteel Road at Friendship Church Road, southwest Cobb County, Georgia. Project contact: Micah Taylor — micah.taylor@freese.com https://ssl.doas.state.ga.us/gpr/eventDetails?eSourceNumber=PE-66365-NONST-2028-000000039&sourceSystemType=gpr20
PREBID
12/8/2026 3:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT