Access the Full Project by Clicking here!
Bidjugde
JOB
Colton Avenue & 6th Street Pipeline
BID DATE
04/13/16 - 3:00
AGENCY
Redlands
ESTIMATE
$500,000
SCOPE
The scope of work for this project is the installation of approximately 5,000 linear feet of 8” pipeline, 4,600 linear feet of 12" pipeline of potable and non-potable water pipeline. Following the pipeline installation, all streets be resurfaced within this project.The work shall consist of all traffic control (including furnishing and installing all arrowboards, barricades, signs, delineators, and flagmen); all utility location and verification (excavating, exposing, and verifying top, bottom, and side of utility facilities); all pavement removal and disposal; all earthwork (including trenching, shoring, sloping, bedding, and backfilling including select imported material or select native material); compacting; furnishing and installing all pipe, fittings, and appurtenances; protecting in place or removing and replacing all existing utilities, trees, and public and private improvements; replacing all asphalt concrete pavement including asphalt concrete overlays; pavement striping restriping; testing and disinfecting all pipelines; replacing destroyed survey monuments; disposing of excess soil and rock material and restoring all areas and improvements to pre-construction conditions. Jason Montgomery - 909-798-7584 x5 jmontgomery@cityofredlands.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT