Access the Full Project by Clicking here!
Bidjugde
JOB
Addison Junction Public Infrastructure Improvements
BID DATE
12/15/26 - 7:00
AGENCY
Addison
ESTIMATE
n/a
SCOPE
Town of Addison. Project No C00057. The project is bounded by Addison Road to the west, Festival Way to the north, Spectrum Drive to the east, and Arapaho Road to the south. The Work consists of roadway and public utility infrastructure improvements, including storm drainage, water distribution, and wastewater systems, along Festival Way, Julian Avenue, Ace Alley, Arapaho Road, and Spectrum Drive. The Project also includes minor public utility improvements and associated pavement repairs on Spectrum Drive and Arapaho Road, installation of conduits along Festival Way, and reconstruction of pedestrian ramps at intersections along Festival Way. Additional Work includes site preparation and demolition, traffic control, erosion and sedimentation control measures, and all other appurtenant work necessary for completion of the Project in accordance with the plans and specifications. Project Number: C00057 Bid Number: 27-31 Contact L. Nathan Ante (Town of Addison) +12144205600 Nathan.Ante@kimley-horn.com. Bids due December 15, 2026 at 2:00 PM Central. Bid location: Finance Building, 5300 Belt Line Road, Dallas, Texas 75254. Pre-bid November 19, 2026 at 2:00 PM Central, non-mandatory. Pre-bid location: Town of Addison Public Works and Engineering Department, 16801 Westgrove Dr, Addison, TX 75001. https://app.civcast.com/bid-opportunities/projects/6af4e256f439c9ed39161093
PREBID
11/19/2026 7:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT