Access the Full Project by Clicking here!
Bidjugde
JOB
Montana Neighborhood Park
BID DATE
03/24/16 - 2:00
AGENCY
Turlock
ESTIMATE
$410,000
SCOPE
The work consists, in general of: Installing curb, gutter, and sidewalk, installing aggregate base and hot mix asphalt, installing landscape and irrigation, installing outdoor fitness equipment, installing a catch basin, storm drain pipe, and bioswale, installing a perimeter fence, installing water and sewer lines, installing drinking fountains, park benches, trash receptacles, pet waste receptacles, and other associated work. Technical Contact: Randall Jones Contact Email: rjones@turlock.ca.us

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT