Access the Full Project by Clicking here!
Bidjugde
JOB
T4746 Martin SR 5 US 1 NW Federal Hwy
BID DATE
12/2/26 - 3:30
AGENCY
FDOT
ESTIMATE
$3,205,618
SCOPE
Florida Department of Transportation District 4. Letting CT261202 Proposal T4746. The Improvements under this Contract consist of, but are not limited to, MOT (standard, traffic control officer, barrier, ped LCD, arrow board, signalization, traffic detection, PCMS, business sign), monitor structures (inspection, settlement, vibration), environmental protection (sediment barrier, inlet, tree), earthwork (excavation, embankment, borrow), concrete (removal, curb, gutter, separator, sidewalk, driveway), asphalt (stabilization, base, milling, resurfacing), pavement markings (detectable, RPM, painted, thermo, bike lane), signing (single-column, internally-illuminated), lighting (conductors, load center, luminaire, pole complete, cable distribution), IST (subsurface doc, location doc, CCTV camera), fiber optic (cable, termination, hardware, locate), signalization (cable, cable remove, span wire remove, prestressed pole F&I/remove, aluminum pole pedestal/remove, steel mast arm, vehicular signal/detection, vehicular video/AVI, ped signal/detection, signal preemption system, controller, field ethernet, UPS), conduit (open trench, directional bore), pull/splice box, electrical service (power, wire), and sod at the intersection(s) of State Road 5 (US-1/NW Federal Highway) and NW Baker Road, and NW North River Shores Boulevard, and NW Sunset Boulevard, for a total of 0.227 miles in the City of Stuart, and in unincorporated portions of, Martin County. Limits: At Baker Rd, At Nw North River Shores Blvd And At Nw Sunset Blvd. Financial project number(s): 44441515201(*), 44441615201, 44441715201. FDOT District 4.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT