Access the Full Project by Clicking here!
Bidjugde
JOB
Structural Reach Replacement Sewer Replacement Phase 1
BID DATE
04/7/16 - 2:00
AGENCY
Los Altos
ESTIMATE
$935,000
SCOPE
The project includes, but is not limited to, the removal and replacement of existing 6-inch and 8-inch VCP sewer mains with 8-inch PVC sewer mains using the open cut method, sewer lateral reconnections, sewer manhole reconnections, surface restoration, traffic control, mobilization, manhole modifications, sewage bypassing, survey referencing and reinstallation of existing survey monuments, and all other work as shown on the Plans and as called for in the Project Specifications and as directed by the Engineer.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT