Access the Full Project by Clicking here!
Bidjugde
JOB
Arlington Blvd Brewster Drive Intersection Safety Improvements (REBID)
BID DATE
09/22/16 - 2:00
AGENCY
El Cerrito
ESTIMATE
$175,400
SCOPE
ORG BID RESULTS WR FORDE $255,000. Mobilization; traffic control and construction signage; pavement repairs; curb ramp construction, adjusting and modify storm drain inlet to grade; installation of storm drain structures and lines; pavement delineation; pavement marker installation; installation of speed feedback signs; and such other items or details that are required by the Plans, Standard Specifications, or these Special Provisions to be performed, placed, constructed, or installed.
PREBID
9/13/2016 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT