Access the Full Project by Clicking here!
Bidjugde
JOB
Branchcliff Lane Streambank Stabilization 2026-10
BID DATE
11/2/26 - 7:00
AGENCY
Anderson SC
ESTIMATE
n/a
SCOPE
City of Anderson, Branchcliff Lane Streambank Stabilization (City Bid No. 2026-10). The work consists of furnishing all materials, equipment, and labor necessary for streambank stabilization, including grading, installation of boulder toe protection and boulder J-hook structures, soil lifts, erosion and sediment control measures, revegetation, site restoration, removal and replacement of gravity sanitary sewer infrastructure, and removal and replacement of sanitary sewer manholes. Allowable construction schedule 180 calendar days. FEMA funded; SAM registration required. Contractors shall have a classification of AP. Bid security 5 percent. Pre-bid conference October 20, 2026 9:00 AM at the project site, 815 Canterbury Road, Anderson, SC 29621. Sealed bids due November 2, 2026 2:00 PM in Council Chambers, 401 South Main Street, Anderson, SC, publicly opened. Electronic bids not accepted. Engineer: Ardurra Group, Inc., 55 Beattie Place, Suite 200, Greenville, SC 29601 (Will Rector, P.E.). Contact: Alex Kostik, akostik@cityofandersonsc.com , 864-231-5931. https://www.cityofandersonsc.com/requests/ https://scbo.sc.gov/printad?a=69457
PREBID
10/20/2026 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT