Access the Full Project by Clicking here!
Bidjugde
JOB
May Street Elevated Sidewalk Catch Basin Replacement Project 661
BID DATE
10/20/26 - 7:00
AGENCY
Hood River
ESTIMATE
n/a
SCOPE
City of Hood River Project #661, May Street Elevated Sidewalk Catch Basin Replacement Project. Located along May Street at the existing elevated sidewalk near the intersection of 13th St and May St, Hood River, Oregon. Work generally consists of replacement of an existing catch basin and associated storm drainage improvements beneath and adjacent to the elevated sidewalk, including excavation; installation of a new catch basin, manhole, storm drain piping and associated drainage improvements; controlled density fill (CDF) backfill; temporary shoring and protection of existing improvements; pavement and surface restoration; and other related work. MANDATORY pre-bid conference October 14, 2026 at 10:00 AM onsite near 13th St and May St. Questions due October 16, 2026 5:00 PM. Sealed bids due October 20, 2026 at 2:00 PM at City of Hood River Public Works, 1200 18th St, Hood River, OR; opened publicly immediately after. 5% bid security; prevailing wages; CCB registration required. Design engineer: Bell Design Company. Contact: Cory Brown, corybrown@belldesigncompany.com. https://cityofhoodriver.gov/bid-center-rfps/
PREBID
10/14/2026 3:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT