Access the Full Project by Clicking here!
Bidjugde
JOB
ITB B-27-01 2026 Parts A-C and F Walts Ave and New St Water Main Improvements
BID DATE
11/12/26 - 7:00
AGENCY
Deland
ESTIMATE
n/a
SCOPE
City of DeLand ITB B-27-01. Installation of new potable water mains, including approximately 1,174 LF of 12", 3,517 LF of 8" HDPE, and 6,978 LF of 6" HDPE installed by horizontal directional drilling; 107 LF of 12" PVC, 235 LF of 8" PVC, 553 LF of 6" PVC, and 634 LF of 2" HDPE installed by open cut; valves, wet tap and dry connections to existing mains, cut-ins, and fire hydrant assemblies; service pipe and casing; connection to existing meters; pavement repair and replacement; surface restoration and appurtenances. 5% bid bond. Non-mandatory pre-bid meeting October 26, 2026 at 10:30 AM, Utilities Administration Executive Conference Room, 2nd Floor, Utilities Administration Building, 1102 Amelia Ave., DeLand, FL 32724. Bids due 2:00 PM Eastern, November 12, 2026. Source: https://www.demandstar.com/app/limited/bids/553113/details Contact: mcmillenc@deland.org
PREBID
10/26/2026 3:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT