Access the Full Project by Clicking here!
Bidjugde
JOB
27012-3802 Richland Creek WTP Pressure Reducing Valve and Flow Meter Vault
BID DATE
11/13/26 - 3:00
AGENCY
Paulding County
ESTIMATE
n/a
SCOPE
Paulding County Water System, Client Project No. 27012-3802. Construction of a new pressure reducing valve (PRV) and flow meter (FM) vault with associated piping and appurtenances at the Richland Creek Water Treatment Plant, 11479 Cartersville Hwy, Dallas, GA: new underground precast concrete PRV/FM vault with access hatches and internal ladder; new finished water piping and sample line with fittings, restraints, and connections to existing mains; PRV, flow meter assembly, isolation and bypass valves; and electrical power, grounding, conduit, wiring, and instrumentation for flow and pressure monitoring integrated with the existing control system. Single prime contract, lump sum and unit price. 5% bid security; 100% performance and payment bonds. Mandatory pre-bid conference Monday, October 26, 2026 at 1:00 PM at the Richland Creek WTP (limit three personnel per firm). Questions due November 6, 2026 at 10:00 AM. Bids due 10:00 AM Friday, November 13, 2026 via the Paulding County Bonfire portal or sealed to the Department of Finance, 240 Constitution Blvd, Dallas, GA 30132. Source: https://ssl.doas.state.ga.us/gpr/eventDetails?eSourceNumber=PE-77892-NONST-2027-000000094&sourceSystemType=gpr20 Contact: tgoldin@paulding.gov
PREBID
10/26/2026 6:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT