Access the Full Project by Clicking here!
Bidjugde
JOB
SV1 2 Water Line Replacement Phase 2
BID DATE
10/22/26 - 7:00
AGENCY
PSWID
ESTIMATE
$1,608,000
SCOPE
Pine-Strawberry Water Improvement District (Owner) is requesting bids for the construction of SV1&2 WLR, Phase 2 (S16599), Pine/Strawberry, Gila County, Arizona. The project will include the installation of approximately 6,700 linear feet of 4 & 6-inch PVC water distribution system pipeline, new gate valves, new water services, and new water meters, to replace PVC pipe, and miscellaneous small diameter water mains. Expected duration of 175 days; work must be completed by April 29, 2027. Federal Davis-Bacon prevailing wages apply; American Iron and Steel requirements apply. Pre-bid conference 10/08/2026 3:30 PM at the PSWID conference room, 6306 W. Hardscrabble Mesa Rd., Pine, and via video conference; attendance encouraged but not required. Bids due 10/22/2026 2:00 PM local time at the Pine-Strawberry Water Improvement District Office, PO Box 134, 6306 Hardscrabble Mesa Rd., Pine, AZ 85544, publicly opened and read. Bidding documents and addenda are issued through the designated website planroom.sunrise-eng.com; Issuing Office: Sunrise Engineering, LLC, 2045 S Vineyard, Suite 101, Mesa, AZ 85210. Owner contact: Melissa Durbin, Program Manager, Pine-Strawberry Water Improvement District, (928) 476-4222. dlangsmith@sunrise-eng.com https://pswid.org/bid-results-project-selections/
PREBID
10/8/2026 7:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT