Access the Full Project by Clicking here!
Bidjugde
JOB
East Side Dike Realignment Between Wasteway No 3 And Dillon Road 2024-13
BID DATE
11/10/26 - 7:00
AGENCY
Coachella Valley Water District
ESTIMATE
n/a
SCOPE
Coachella Valley Water District, Engineering Department, Specification No. 2024-13, East Side Dike Realignment between Wasteway No. 3 and Dillon Road. The project consists of the realignment and rehabilitation of approximately 3,400 linear feet of the existing East Side Dike. Categories include general construction, concrete, geotechnical/soils, structural steel, flood control and grading. Class A General Engineering license required. Project duration 120 working days; anticipated start December 9, 2026. Liquidated damages $4,000 per day. Bid bond 10%; payment and performance bonds 100%. Lump sum award. Successful bidder must provide Installation Floater/Builders Risk insurance including flood and earthquake for the full contract amount (Section 5 of the General Conditions). MANDATORY pre-bid meeting October 13, 2026 9:00 AM PDT, onsite at the East Side Dike at Wasteway No. 3. Online Q&A deadline October 20, 2026 5:00 PM PDT. Bids due November 10, 2026 2:00 PM PDT, electronic via PlanetBids. Contact: Jose Raya 760-398-2651 ext. 3233 jraya@cvwd.org. Owner address: 75-515 Hovley Lane East, Palm Desert, CA 92211 (Riverside County). https://vendors.planetbids.com/portal/16339/bo/bo-detail/146987
PREBID
10/13/2026 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT