Access the Full Project by Clicking here!
Bidjugde
JOB
Main Street Revitalization Phase 2
BID DATE
10/21/26 - 7:00
AGENCY
Mountlake Terrace
ESTIMATE
n/a
SCOPE
The Main Street project includes improvements along 56th Avenue W corridor with a northern boundary approximately 445 feet north of the intersection of 56th Ave W and 230th St SW, and a southern boundary approximately 145 feet north of the intersection of 56th Ave W and 236th St SW. The project will reconstruct existing roadways to allow two travel lanes, one two-way left turn lane, and bike lanes. Other work includes replacement of curb and gutter, construction of sidewalks with tree wells, LED pedestrian and street lighting, upgrade of storm drainage, joint utility trench, upgrade to watermain, upgrade of curb ramps to ADA guidelines, and modifications/upgrading of traffic signals including installation of accessible pedestrian push buttons and installation of optical fiber and connection to the City of Lynnwood’s traffic control center. https://cityofmlt.com/bids.aspx?bidID=95 bmckeever@mltwa.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT