Access the Full Project by Clicking here!
Bidjugde
JOB
Shoreline Transfer Station Dust Control
BID DATE
10/20/26 - 6:30
AGENCY
King County - WA
ESTIMATE
n/a
SCOPE
The purpose of the contract is to install a new dust control system at the Shoreline Transfer Station. The work includes but is not limited to installation of a steel partition wall on mezzanine over tipping floor, construct and install misting system modifications including new pump, air compressor, sensors, control, programming, testing and commissioning, installation of supply fan and tie into existing controls, demolition of duct hood and cap ducting, test and balance HVAC system in office area, repair damaged section of air barrier, and all other work in the contract documents. https://fa-epvh-saasfaprod1.fa.ocs.oraclecloud.com/fscmUI/faces/NegotiationAbstracts?prcBuId=300000001727151&_adf.ctrl-state=85yogms0sjvuxa_1&_afrLoop=6969931970354080&_afrWindowMode=0&_afrWindowId=&j3xbor=1790297470.2253d3d3LmJ4d2EuY29t092624fc48d7c81a6d2d508420d0926896d3436ab5c57e37080&_afrFS=16&_afrMT=screen&_afrMFW=1279&_afrMFH=802&_afrMFDW=1536&_afrMFDH=960&_afrMFC=8&_afrMFCI=0&_afrMFM=0&_afrMFR=120&_afrMFG=0&_afrMFS=0&_afrMFO=0 lsnyder@kingcounty.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT