Access the Full Project by Clicking here!
Bidjugde
JOB
Sun City Lift Station Odor Control Improvements
BID DATE
03/24/16 - 10:00
AGENCY
Eastern Municipal WD
ESTIMATE
$3,000,000
SCOPE
Demolition of existing features and facilities including, but not limited to, removal and disposal of: all existing equipment, structures, piping, appurtenances, and concrete pad associated with the existing belt filter press facility and associated polymer feed system unless otherwise noted; and asphalt paving, concrete, and soil required for installation of new pipelines. 2. Salvage of existing facilities including: all components of existing Biocube and dry media scrubber odor control systems; and screw conveyor located at the belt filter press facility. 3. On-Site Grading and Appurtenant Site Work including, but not limited to: clearing and grubbing as required; rough and finish grading; import and/or export material as required; removal and repair of site AC paving; removal and repair of concrete swale and concrete road; preparing and implementing Best Management Practices (BMPs) (see SC-15); and miscellaneous on-site related work. 4. Odor Control System Pipeline and Duct Work including, but not limited to: furnishing, delivery and installation of 18-inch, 20-inch, and 24-inch diameter fiberglass reinforced plastic (FRP) duct and fittings, FRP dampers, small diameter polyvinyl chloride (PVC) pipe and appurtenances (for brackish water line, water line, drain lines, and water control cabinet piping), and small diameter stainless steel pipe and appurtenances for hose station piping; all pipe and duct joints; pipe supports; valves and appurtenances; locator wire; pipeline connections including taps; pipe and duct supports; trenching; trench sheeting, shoring and bracing per California Labor Code; import of required backfill material; control density fill; hydro-testing, miscellaneous testing, and field startup and testing; and in-kind site improvements. 5. Odor Control System including, but not limited to: furnishing, delivery, and installation of complete odor control system including degreaser, biotrickling filter (with appurtenant piping, pumps, access, and controls), demister, two blowers with acoustical enclosures; activated carbon unit; reinforced concrete slab and footings; sunshade structure for odor control panel; equipment anchorage; safety equipment; painting and finish work; architectural treatments; and miscellaneous building related work. 6. Pump Station/Wet Well Modifications per the Contract Drawings including, but not limited to: three corings for 18-inch diameter FRP duct; one coring for 6-inch diameter drain line; furnishing, delivery, and installation of 18-inch diameter FRP in wet well with hanger supports,18-inch diameter stainless steel piping and appurtenances for submersible pump discharge piping, pipe supports, 18-inch check valves, air release valves, slide gate and operator, and submersible pump guide rails; spark testing of existing wet well liner and wet well liner repair; and concrete plugging of existing 14-inch diameter openings in intermediate wet well wall. NIB-3 00012 Notice Inviting Bid 7. Electrical Work and Equipment including, but not limited to: electrical power equipment, conduits and wiring; ducts to existing electrical room, including pavement removal and replacement; instrumentation equipment and panels; variable frequency drives (VFDs) with cabinets, including related conduits, wiring and connections; conduits, wiring and connections for pumps, blowers, pressure instruments, and other instruments; arch flash hazard study and report; providing all trenching, pull boxes, conduits, sweeps, wiring, connections, encasements, temporary power, removals and disposals, backfilling, compaction, and other appurtenant work for the installed electrical materials and equipment. Gabriel Buenagua buenagug@emwd.org c/o Jennifer Donnelly; EMAIL: donnellj@emwd.org
PREBID
2/16/2016 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT